LONDON WALLET
  • Home
  • Investing
  • Business Finance
  • Markets
  • Industries
  • Opinion
  • UK
  • Real Estate
  • Crypto
No Result
View All Result
LONDON WALLET
  • Home
  • Investing
  • Business Finance
  • Markets
  • Industries
  • Opinion
  • UK
  • Real Estate
  • Crypto
No Result
View All Result
LondonWallet
No Result
View All Result

Two more New England offshore wind farms just got the all-clear

Robert Frost by Robert Frost
July 1, 2024
in Industries
Two more New England offshore wind farms just got the all-clear
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter


Photo Credit: Eric Haynes

Avangrid (NYSE: AGR) now has full federal approval of the Construction and Operations Plan (COP) for the New England Wind 1 and 2 offshore wind farms.

The approval of the COP follows the favorable Record of Decision (ROD) issued by the Biden Administration in April 2024. The milestone approval largely completes the federal, state, and local permitting process for sustainable energy company Avangrid’s 791-megawatt (MW) New England Wind 1 project.

You might also like

Kia launches three new electric GT vehicles in Korea, starting at $37,000

Toyota reveals the interior of its 3-row electric SUV ahead of its big debut

Ford denies report that it plans to build EVs in the US with China’s Xiaomi

The New England Wind 1 and New England Wind 2 projects together would have a total capacity of up to 2,600 MW of renewable energy that BOEM estimates could power more than 900,000 homes annually.

The two offshore wind farms would be approximately 20 nautical miles south of Martha’s Vineyard, Massachusetts, and about 24 nm southwest of Nantucket, Massachusetts. The COP includes up to 129 wind turbines and up to five offshore export cables transmitting electricity to onshore transmission systems in the Town of Barnstable and Bristol County, Massachusetts.

In March 2024, Avangrid submitted multiple proposals for the New England Wind projects to the Massachusetts-Rhode Island-Connecticut Multi-State Procurement for Offshore Wind. The states are expected to announce the winners in August 2024.

Avangrid asserts that New England Wind 1 is the only project in the solicitation with all federal, state, and local permits, the ability to start construction in 2025, and deliver power by 2029.

New England 1 will border Vineyard Wind 1 to the south. Last week, Avangrid announced that it had brought 10 turbines in total online at Vineyard Wind 1, making it the largest operating offshore wind farm in the US.

Read more: Vineyard Wind 1 just became the US’s largest operating offshore wind farm


To limit power outages and make your home more resilient, consider going solar with a battery storage system. In order to find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. They have hundreds of pre-vetted solar installers competing for your business, ensuring you get high quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use and you won’t get sales calls until you select an installer and you share your phone number with them.

Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisers to help you every step of the way. Get started here. –affiliate link*

FTC: We use income earning auto affiliate links. More.



Source link

Share30Tweet19
Previous Post

Experts say latest SCOTUS opinions will limit SEC power over crypto

Next Post

What the new IRS guidance on crypto tax reporting means for investors

Robert Frost

Robert Frost

Jutawantoto Jutawantoto Jutawantoto Jutawantoto Berita Terbaru Hari

Recommended For You

Kia launches three new electric GT vehicles in Korea, starting at ,000
Industries

Kia launches three new electric GT vehicles in Korea, starting at $37,000

February 2, 2026
Toyota reveals the interior of its 3-row electric SUV ahead of its big debut
Industries

Toyota reveals the interior of its 3-row electric SUV ahead of its big debut

February 2, 2026
Ford denies report that it plans to build EVs in the US with China’s Xiaomi
Industries

Ford denies report that it plans to build EVs in the US with China’s Xiaomi

February 2, 2026
Candela’s hydrofoil ferry just rewrote the limits of electric boats
Industries

Candela’s hydrofoil ferry just rewrote the limits of electric boats

February 2, 2026
Next Post
What the new IRS guidance on crypto tax reporting means for investors

What the new IRS guidance on crypto tax reporting means for investors

Related News

Trump picks ex-SEC chair Jay Clayton as US Attorney for Manhattan

Trump picks ex-SEC chair Jay Clayton as US Attorney for Manhattan

November 14, 2024
Rental market suffering from a lack of new build homes, says agency boss – London Wallet

Rental market suffering from a lack of new build homes, says agency boss – London Wallet

June 20, 2024
The machine economy has arrived and bots have wallets

The machine economy has arrived and bots have wallets

June 1, 2025

Browse by Category

  • Business Finance
  • Crypto
  • Industries
  • Investing
  • jutawantoto
  • Markets
  • Opinion
  • Real Estate
  • UK

London Wallet

Read latest news about finance, business and investing

  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2025 London Wallet - All Rights Reserved!

No Result
View All Result
  • Checkout
  • Contact
  • Home
  • Login/Register
  • My account
  • Privacy Policy
  • Terms and Conditions

© 2025 London Wallet - All Rights Reserved!

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?