LONDON WALLET
  • Home
  • Investing
  • Business Finance
  • Markets
  • Industries
  • Opinion
  • UK
  • Real Estate
  • Crypto
No Result
View All Result
LONDON WALLET
  • Home
  • Investing
  • Business Finance
  • Markets
  • Industries
  • Opinion
  • UK
  • Real Estate
  • Crypto
No Result
View All Result
LondonWallet
No Result
View All Result

E-quipment highlight: JLG E313 electric telehandler

Robert Frost by Robert Frost
October 6, 2024
in Industries
E-quipment highlight: JLG E313 electric telehandler
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter


Designed for both all-terrain and off-road use, the all-electric E313 telehandler from JLG is a new, low-noise solution for moving materials around indoor construction, urban, residential, and municipal projects.

With a 3,500-pound maximum lift capacity and 13-foot maximum lift height with a five foot forward reach, the new JLG E313 is a first-of-its-kind all electric telehandler designed to silently load and unload trucks and flatbeds, moving materials around, or accessing work at-height in single-story work environments.

Oh, and it can do all those things indoors.

“As job sites evolve, machines need to evolve with them,” says John Boehme, JLG’s senior product manager for telehandlers. “Our new E313 electric-powered telehandler transforms how work is done in emission-free spaces and noise-sensitive environments by delivering a quieter, more efficient working experience.”

Based on the AUSA 4 meter/1,600 kg T164E battery powered electric telehandler, the JLG version ships with JLG’s universal skid-steer coupler system. That allows the E313 to attach to various existing JLG telehandler and skid-steer loader attachments, including carriages, forks, and buckets. The E313 also features an integrated hitch for hauling tools and trailers around the job site, increasing job efficiency by reducing the need for additional tractors on-site.

Charged up

The E313 uses six 48V lithium ion batteries sending power to an electric motor mated to a two speed transmission with two wheel drive and steer. The 18.6 kWh battery pack (6 x 3.1 kWh batteries) is good for up to four hours of continuous run time, and can be recharged in two to three hours on a L2 AC charger, or overnight on standard 100V.

You might also like

Tesla didn’t remove the Robotaxi ‘safety monitor’ – it just moved them to a trailing car

The 641hp Hyundai IONIQ 6 N launches in the UK with a new virtual gear shift and fun extras

Here are 8 tips for the best EV winter range and performance

JLG’s ClearSky Smart Fleet telematics management system is standard.

SOURCE | IMAGES: JLG, via Heavy Equipment Guide.

FTC: We use income earning auto affiliate links. More.



Source link

Share30Tweet19
Previous Post

Tottenham XI vs Brighton: Starting lineup and confirmed team news

Next Post

Brighton vs Tottenham: Premier League – LIVE!

Robert Frost

Robert Frost

Jutawantoto Jutawantoto Jutawantoto Jutawantoto Berita Terbaru Hari

Recommended For You

Tesla didn’t remove the Robotaxi ‘safety monitor’ – it just moved them to a trailing car
Industries

Tesla didn’t remove the Robotaxi ‘safety monitor’ – it just moved them to a trailing car

January 22, 2026
The 641hp Hyundai IONIQ 6 N launches in the UK with a new virtual gear shift and fun extras
Industries

The 641hp Hyundai IONIQ 6 N launches in the UK with a new virtual gear shift and fun extras

January 22, 2026
Here are 8 tips for the best EV winter range and performance
Industries

Here are 8 tips for the best EV winter range and performance

January 22, 2026
Chevy Bolt EV put on the back burner as GM plans to bring gas cars to Kansas plant
Industries

Chevy Bolt EV put on the back burner as GM plans to bring gas cars to Kansas plant

January 22, 2026
Next Post
Brighton vs Tottenham: Premier League – LIVE!

Brighton vs Tottenham: Premier League - LIVE!

Related News

Thanks to ‘vesting’ schedules, it can take up to 6 years for workers to own their 401(k) match

Thanks to ‘vesting’ schedules, it can take up to 6 years for workers to own their 401(k) match

May 26, 2023
PLP granted planning consent for 1 million sq ft logistics building

PLP granted planning consent for 1 million sq ft logistics building

May 19, 2023
One of the last paths to student loan forgiveness under Trump — the IBR plan — is in trouble

One of the last paths to student loan forgiveness under Trump — the IBR plan — is in trouble

September 25, 2025

Browse by Category

  • Business Finance
  • Crypto
  • Industries
  • Investing
  • jutawantoto
  • Markets
  • Opinion
  • Real Estate
  • UK

London Wallet

Read latest news about finance, business and investing

  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2025 London Wallet - All Rights Reserved!

No Result
View All Result
  • Checkout
  • Contact
  • Home
  • Login/Register
  • My account
  • Privacy Policy
  • Terms and Conditions

© 2025 London Wallet - All Rights Reserved!

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?